3838608134_d8370b79a7Between last night and today I got two triangles and 3 blocks quilted on “Insanity”!  And I even got back to 3838608800_9ae3167b1cwork on “Insanity Revisited” it had been about 6 weeks since I had touched it.  All in all a productive day.

On the left are the triangles on Row J, and the photo on the right are blocks 2 & 1 (left to right) for Row J.

3838609448_103f172a8dOn the lower left is block #3 of Row J.

And the pretty red and white block is from “Insanity Revisited” and that is from Row G # 11.3838618134_f406ec66d8 Just click on the photo’s to enlarge.

Other than going to the fitness center earlier today it has been a bit of a lazy day for me.  I think I am in a lazy mood after all the work last week and a little from the week before on the painting ect.  It kind of tired me out and I had a bit of trouble with my shoulders and neck from all the painting!  I have had to rest them out and do some stretching with them.  It is feeling much better today.  That painting can really get to you when you aren’t use to it.

2 Responses to “Back to work on “Insanity” (Dear Jane)”

  1. Well I wouldn’t say you were lazy, you did get some stitching done. I’m really looking forward to aches and pains when we start painting. After 10 years it all needs to be done ICK LOL

    Crispy

  2. The quilt is looking wonderful!
    .-= Melanie´s last blog ..Eureka! =-.

Leave a Reply

You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

CommentLuv badge