I do have one more block prepped and ready to go but today was taken up with other things. Blueberry picking first thing this morning. I met CJ at 7 and we headed out to my brother’s farm. We had a great day for berry picking. Neither of us had “fixed” ourselves up we assumed we would be hot and sweaty with hats and bug spray. We were pleasantly surprised when the weather stayed at a comfortable 70 (?) and very cloudy. Here are photos of the farm – caught CJ in a couple ( but not close ups – not when we aren’t fixed up
)
another part of the farm - those are rows of blueberries. I should have taken a close up of the berries but didn't think to do so - lots of ripe ones out there.
and more blueberries - I have no idea how many rows and plants he has - I will need to ask him sometime. Doesn't he have a pretty view
My brother Jeff and his daughter Lily busy at work. Lily helps out every summer and does a good job. Back of CJ.
Instead of starting the dehydrator with blueberries today seeing as it stayed nice out I was working outside instead. The berries are washed and I will start that process tomorrow. Also the plan is to make fresh muffins and a cheesecake with blueberry topping.
Tonight I will get back to work on a Dear Jane Block – number 8 I believe it is I prepped it last night so it is ready for stitching. Last night I got to work looking through the Red and Green Applique blocks and picked out two that I will start prep work on. I have the patterns traced out on to freezer paper and will need to get those pieces cut out and then I will glue baste the design down so I will not need to bring the overlay with me on the trip – just no room for something like that. After I get these two blocks glue basted down I will look and see if I want to do another 2 blocks to bring also – sometimes they really go quickly. I still need to draw the quilting lines on the small quilt I plan to quilt on the road also. Too busy!
{ Comments on this entry are closed }








